One tower crane is being assembled on the Highway 407 subway station construction site, west of Jane Street and south of Highway 407. This tower crane supports the transfer of building materials into the excavation site during the building of Highway 407 Station and portions of the subway tunnel. The crane will remain on the site for approximately two years. Its location is indicated on the map (below) in red.
For more Toronto-York Spadina Subway Extension project information, call 416-481-2523 (daily, between 8am and 6pm; closed holidays).