To complete water main repairs, there will be a temporary closure of the southbound lane of York Boulevard, just west of James Gillies Street (bus loop). The closure will be in effect from 6pm on Monday, Aug. 12 to 7am on Tuesday, Aug. 13, and again from 6 to 11:59pm on Aug. 13.
Traffic control measures will be in place to ensure the safety of those driving through the work site. Drivers should watch for and obey all traffic signs and traffic control personnel. Minor traffic delays should be anticipated.
Questions or concerns can be directed to Shawn Payne, assistant chief engineer, at ext. 55623 or shawnp@yorku.ca.