Skip to main content Skip to local navigation

TEL Building entrance foot grille replacement

To improve the safety and appearance of the entrance ways, all entrance foot grilles in the Technology Enhanced Learning (TEL) Building will be replaced. This work will start the evening of Monday, March 24, and is expected to be completed by the morning of Thursday, April 3. Refer to the work schedule outlined below.

  • TEL Building southwest entrance: from 10pm on Monday, March 24 to 7am on Wednesday, March 26.
  • TEL Building southeast entrance (between Seneca and TEL): from 10pm on Wednesday, March 26 to 7am on Thursday, March 27.
  • TEL Building south entrance: from 10pm on Sunday, March 30 to 7am on Tuesday, April 1.
  • TEL Building north entrance (both sides): from 10pm on Tuesday, April 1 to 7am on Thursday, April 3. This work will be performed one side at a time, with one entrance remaining open at all times.

The specified entrances will not be accessible while work is being performed and all work will be performed between the hours of 10pm and 7am.

Questions and concerns can be directed to David Sweet, Zone 4 maintenance supervisor, at 416-320-1148, or Steve Fraser, manager of maintenance, at 416-220-3863.